Default9519RENOVA,Inc.
Renova Completes Repair Work, Resumes Operations at Tokushima-Akita Plant
TOKYO, Jul 29 (Pulse News Wire) – Renova,inc. (9519.T) announced that repairs to a damaged steam control valve connected to a high-pressure turbine at the Tokushima-Akita plant had been completed as scheduled.
Normal operations resumed on July 25, 2026. The shutdown was within the planned unexpected downtime range for the biomass power generation business for the fiscal year ending March 2027, and therefore did not impact the consolidated performance forecast for the same period.
Should any further significant developments arise, the company stated it would promptly disclose such information.
End of article
