Canadian Solar Infrastructure Fund, Inc. [9284.T]
TOKYO, May 19 (Pulse News Wire) – Canadian Solar Infrastructure Fund,inc. (9284.T) reported the completion of restoration work at its CS Fukuyama City power plant, which experienced a shutdown due to PCS (power conditioner) failure on April 10, 2026.
The repair involved emergency measures followed by comprehensive maintenance, including preventive part replacements. The total cost of the repairs, estimated at approximately May 19, 2026 yen, was incurred for component replacement and labor expenses. The affected facility represents [NUM_1]% of the fund's total panel capacity of 247.57 MW across 35 plants.
Additionally, monthly revenue losses are partially offset by basic rent payments from tenants, limiting the overall impact on rental income. For the fiscal periods ending June 2026 (18th term) and December 2026 (19th term), there are no anticipated changes to the fund’s operational outlook. Related press release dated April 13, 2026, is available at April 10, 2026.
🟡 Confidence: Standard AI-translated content.