TOKYO, Mar 09 (Pulse News Wire) – Tokyo Infrastructure Energy Investment Corporation (9285.T) reported its total power generation for February 2026 was approximately 1.6% lower than forecast, totaling 5,176,543 kWh compared to the predicted 5,261,756 kWh. The company's solar energy assets generated a combined 4,413,328 kg of CO₂ reductions during the month.
In detail, the February performance showed a decrease of 85,213 kWh against the projected figures. Among individual facilities, TI saw a drop of 2,601 kWh while TI experienced a slight increase of 4,751 kWh.
Despite some variations, overall production across all sites fell below expectations due to various factors impacting output control measures. The report also detailed the implementation status of output control measures for renewable energy facilities during the same period, noting specific instances where online control systems were utilized.
🟢 Confidence: High AI-translated content.