S Crypto Energy Inc. [5721.T]

TOKYO, Jun 18 (Pulse News Wire) – S Crypto Energy Inc. (5721.T) announced today that its board of directors, held on June 18, approved the construction of a battery storage facility named SCE Satsuma Isazushi Power Station in Isazushi City, Kagoshima Prefecture.

The project involves a contract with RE100 Electric Co., Ltd. for the operation of the facility. The project includes the installation of a 2 MW power capacity and 8 MWh energy storage system. Construction began in June 2026 and is expected to be completed by February 2027.

Enefoward Corp., known for its extensive experience in such projects, was commissioned to carry out the work. This initiative aims to contribute to sustainable development by enhancing grid stability through renewable energy integration and diversifying the company's revenue base. The agreement with RE100 Electric leverages their expertise in electricity trading and advanced AI systems to optimize operations across multiple markets, reducing operational risks and maximizing returns. Regarding the impact on fiscal 2027 performance, S Crypto Energy stated that further analysis is ongoing.

Any significant findings will be disclosed promptly.

Original Disclosure (PDF)

🟢 Confidence: High AI-translated content.