Canadian Solar Infrastructure Fund,Inc. [9284.T]
TOKYO, Apr 13 (Pulse News Wire) – Canadian Solar Infrastructure Fund,inc. (9284.T) reported a power generation shutdown at its CS Fukuyama solar plant due to a PCS (power conditioner system) failure on the evening of April 13, 2026.
The outage continues as investigations and emergency repairs are underway, with plans to restore operations soon. The affected facility represents approximately 3.31 MW out of the fund's total panel capacity of 247.57 MW across 35 plants.
Monthly revenue loss is expected to be limited since a portion equivalent to the predicted monthly generation is covered through base rent payments. As such, there are no revisions to the forecasted operational status for the June 2026 quarter (18th fiscal period) and December 2026 quarter (19th fiscal period).
Further updates on the cause, repair details, and estimated damages will be communicated once confirmed.
🟡 Confidence: Standard AI-translated content.