Source disclosure: January 13, 2026

Canadian Solar Infrastructure Fund,Inc. [9284.T]

TOKYO, Jan 13 (Pulse News Wire) – Canadian Solar Infrastructure Fund,Inc. (9284.T) reported its solar power plant electricity generation performance for December 2025 and the effects of output control measures implemented during the month.

Total generated electricity was 15,504,012 kWh, exceeding expectations by 4.65%. However, CS High City Power Plant experienced reduced production due to snowfall. The fund noted that despite some plants facing output controls and snow impacts, overall weather conditions were stable and favorable for solar radiation.

Only one facility, CS High City Power Plant, fell below expected generation levels due to snow accumulation. Total lost revenue from December's output control measures amounted to ¥1.3 million. Cumulative lost variable rent income since the beginning of the fiscal year through December reached ¥50.6 million, representing 1.09% of the anticipated rent income for the investment trust.

The company highlighted that fixed rents are calculated monthly based on P50 estimated generation volumes, while lost variable rents reflect potential earnings had the plants operated without such controls.

AI-translated content. 🟡 Confidence: Standard See termsOriginal filing

💬 Help us improve translation quality
Notice any errors in this article? Let us know with one click.
🎁 Report 3+ errors with your email and get a free month of premium access